How Long Does It Take to Build and Install Modular Buildings
Content
- Preparation Phase
- Financial Planning Phase (1–5 Weeks)
- How Long Does It Take To Build A Modular Home?
- How Long Does It Take To Build A Concrete Pool?
- Steps in the Swimming Pool Construction Process
- Equipment Delays
- Type of Pool

Preparation Phase
We provide transparent communication, personalized advice, and meticulous attention to detail every step of the way. Renovating a pool is a significant investment, and we are dedicated to making the process as stress-free as possible. The timeline can vary based on the pool’s size and the complexity of the resurfacing work. For instance, a simple plaster resurfacing might be quicker, while more intricate finishes like exposed aggregate or glass tiles could take longer. Weather conditions and material availability can also impact the schedule. This technique offers both versatility in design and a relatively faster installation time compared to gunite construction. However, the vinyl liner may require replacement after a certain period, which can add maintenance time to the pool building process. Finalizing construction plans is the next crucial element of the planning and design phase. This includes detailed drawings and specifications that outline the construction process, materials required, and the estimated timeline. These plans serve as a roadmap for the pool builders and help ensure a smooth and efficient construction process. This phase includes excavation, framing, plumbing, electrical work and finishing touches like plastering or liner installation.
Multi-sided Pools
- Building an inground pool can be an exciting journey filled with anticipation.
- Building a pool is a significant investment that requires time and careful planning.
- While this is an easy solution on paper, it can not only be time-consuming, but add significant expense to the project.
The introduction of container pools has further revolutionized the industry, offering durable and cost-effective options made from used shipping containers. During the inspections, the authorities will assess various aspects of the pool, including the electrical and plumbing systems, fencing, drainage, and overall construction. These examinations ensure that all necessary precautions have been taken to minimize potential hazards and ensure the pool is safe for use. Excavation is the next step, where the construction crew carefully removes the soil or earth to create the pool’s shape and depth. This process can involve the use of heavy machinery, such as excavators, to dig the hole according to the pool design specifications. The availability of construction materials and labor is another crucial factor. These details not only enhance the aesthetic appeal of your pool, but also ensure its longevity and durability. Factors that influence installation time include pool size, design complexity, the type of materials selected, and the specific site conditions. Proper site preparation can also significantly impact the overall timeline. While your building site is being prepared, the actual modules of your home are constructed in a factory setting.
Financial Planning Phase (1–5 Weeks)
A major step you can take to prevent delays is to find out what’s required of you as a pool owner. If you need a gate for the permit, you can install that beforehand so that your city doesn’t immediately reject your permit. The contractor you plan to hire is probably already very familiar with city or county swimming pool regulations, so you can also talk to them. This price offers a more affordable option compared to traditional installations.
How Much Does A Modular Home Cost?
The components of the home are pre-cut and pre-fit and then assembled on-site according to its design specifications. Modular homes follow the same local building codes as traditional homes. They come in a variety of sizes and styles, from single-family to multi-family dwellings. This can include permits for excavation, electrical work, and plumbing. https://pad.stuve.uni-ulm.de/aCWYpunpQX-HlNbMRFeRWg/ will also ensure that the pool meets all local building codes and regulations. The timeline can vary based on several factors, from the type of pool you choose to the weather conditions in your area.
How Long Does It Take To Build A Modular Home?
During this phase, we will install the skimmers, main drain, return plumbing lines, etc. If you have any additional water features such as a waterfall, the lines for this would be installed at this point as well. The time this takes will depend on how many lines must be installed per your design requirements.
How Long Does It Take To Build A Concrete Pool?
This involves submitting detailed plans of your pool to the local authorities. Great for lap swimming and have the shortest construction time due to their simplicity. Plunge pools are much smaller than traditional pools, typically around six-by-six feet in size. They are suitable for those with limited space or budget, offering a versatile option among various pool types, including lap pools and infinity pools. Plunge pools provide a refreshing dip without the need for a large area.

- First, excavators will dig the hole for your pool before work on drainage layers, framework and plumbing are completed.
- Add $15 to $80 per square foot for site prep, foundation, utility construction, finishings, and assembly.
- Overall, expect a construction period of about 8 to 12 weeks, depending on various factors.
- If you're looking for a low-maintenance, durable, and stylish pool option, fiberglass might be the perfect choice for you.
- If you decide to tweak your pool design, maybe adding water features or changing the pool deck material, it’ll extend the timeline.
- It’s first prefabricated off-site then transported to the installation site which significantly reduces the timeline for construction.
Steps in the Swimming Pool Construction Process

Some of the factors that can impact the foundation laying process include the need for inspection, plumbing, and basement waterproofing. Since the land needs to be prepped for the foundation, it can take as much as four weeks to finish this process, after which you should be ready to start building the modules. Among the most important stages of the modular home building process involves building the foundation. To perform this process, it’s important that the lot is leveled and well-drained.
Pool Equipment Installation
It’s essential to gather all necessary documentation beforehand to ensure a smoother approval process. Oasis Pools is proficient in building custom gunite swimming pools and spas tailored to your vision. Our skilled designers and builders recognize that your pool is an extension of your lifestyle, not just a water feature. We collaborate closely with you to design and create a pool that complements your home and reflects your unique taste.
Type of Pool
Conducting a thorough site evaluation with professionals before purchasing land for a modular home is crucial. Keep in mind that these things can go longer than what people agree on, so don’t get stuck on the dates the builder tells you. It is better to have face to face meeting with them and discuss, so if they aren’t available, you can ask someone else with an open schedule. There won’t be many builders available who can do this work professionally. So, depending on how busy they are, things may take a bit longer than your expectations.
